With the wells drilled, the next step is to link the wells through a "header pit", the bring the wells into the house. Essentially the 20 wells are integrated into 2 supply lines and 2 return lines going into the house. The back hoe dug 6 foot deep channels adjacent to each well, and toward the central location where the header pit will be placed.
With the channels cut in, the well pipes are laid down towards the header pit.
Each of the wells are integrated into the header pit into these long plastic pipes. The end of the pipes feed into the set of 4 larger pipes that feed into the house systems.